2025 11th Street Pedestrian Improvement Project

The City is working with the Wisconsin Department of Transportation (WisDOT) to reconstruct 11th Street from Coulee Road to Wisconsin Street. The project includes replacing the asphalt pavement, reconstructing curb and gutter, constructing an 8-foot-wide bituminous path on the west side, and replacing the watermain from Summer Street to Laurel Avenue.  

The project will begin at the end of April 2025 and is scheduled to be completed at the beginning of September 2025.  

Detour Route

The project will be closed to through traffic. A map of the detour route can be found here: 11th Street Construction Detour Route (PDF)

Project Updates

WisDOT will be handling the project management of the construction. Updates for the project can be found at the WisDOT Project Website (HTML)

  1. Design
  2. Special Assessments

Project Details

The City is planning to reconstruct 11th Street from Coulee Road to Wisconsin Street to address the poor pavement condition and provide safer pedestrian accommodations. The design takes into consideration the public comments received at the Public Involvement Meeting and the Hudson School District Safe Routes to School Plan completed in 2018 for E.P. Rock Elementary School. 

11th Street Design Layout (PDF)

11th Street Final Design Plans (PDF)

Safe Routes to School Plan

E.P. Rock Elementary School Safe Routes to School Plan (PDF)

Public Involvement Meeting No. 1

The city hosted a public involvement meeting on January 16th, 2024. Materials from this meeting can be viewed at the links below. 

Public Involvement Meeting Presentation (PDF)

Public Involvement Meeting Handout (PDF)

11th Street Typical Sections (PDF)

11th Street Conceptual Design Layout (PDF)